CROSS COUNTRY PIPING
 
NAME OF CLIENTS DESCRIPTION OF
THE WORK
YEAR OF EXECUTION
GAS AUTHORITY OF INDIA LTD. PIPELINE LAYING AND COMPOSITE WORK FOR KG BASIN-II GAS PIPELINE PROJECT (16" DIA. x 10 KM)
More Details  

2002
BHARAT PETROLEUM CORPORATION LIMITED., KANDLA FAB. & ERECTION OF BLACK OIL PIPELINE FROM KPT JETTIES TO BPCL INSTALLATION AT KANDLA. 1997
TORRENT GUJARAT ENERGY CORPORATION LIMITED PAGUTHAN, BHARUCH LAYING & JOINTING OF 914 MM DIA 12.5 KM PIPELINE INCLUDING WRAPPING & COATING WITH PERMANENT CATHODIC PROTECTION. 1996
BHARAT PETROLEUM CORPORATION LIMITED, KOYALI HOOKUP PIPELINE FROM GUJARAT REFINERY TO KOYALI STORAGE POINT (12" X 27 KM U/G PIPELINE) 1996
INDIAN PETROCHEMICALS CORPN. LTD., BARODA
LAYING & JOINTING ERW 356 MM DIA FOR 2 MGD CONSTRUCTION WATER SUPPLY SCHEME FOR GANDHAR PETROCHEMICALS COMPLEX 1992
INDIAN PETROCHEMICALS CORPN. LTD. 25 KM CROSS COUNTRY PIPELINE FOR WATER SUPPLY 1991-92
GUJARAT PETROSYNTHESE LTD., BARODA FABRICATION, ERECTION, TESTING OF PIPELINE FROM GACL TO GPL PLANT 1985