LP Piping System and storage Tanks for 2 X 125MW Captive Power plant.
Scope of Work :
Design, Detail Engineering, Supply, Fabrication, Erection, Testing, Painting, of LP Piping System and storage Tanks Including civil work like excavation sand pad foundation etc.
Job Description
Quantum
CS Pipes (25NB to 500NB)
20027.6 Inch Meter
Site fabricated pipes from IS 2062 Plate (72”, 48” )
106320 Inch meter
GI Pipes ( 25 NB to 500NB)
13921 Inch meter
Excavation & backfilling
20000 cubic meter
Coating & Wrapping work with supply for underground piping
10000 Sq. Mtr.
Valves, Fittings, Rubber Expansion bellow, Pumps, Motors etc.
LOT
Fabrication and Erection MS tank
10 mtr Dia x 7 Mtr Height
8 mtr Dia x 5 Mtr Height
The above tank was provided with complete piping system which includes Local Control Panel, Valves, Pressure relief valves, Screw Pumps with motors, Level Switch & DP Transmitter.
The tank with complete circulation system is approved by Department of Explosives (CCOE, Nagpur)
Pictorial
View of Unit Piping
JINDAL STAINLESS LIMITED DUBURI - ORISSA