OIL AND NATURAL
GAS CORPORATION LTD. - MEHASANA MODIFICATION/UPDRADATION
OF GROUP GATHERING STATIONS |
|
| |
|
|
|
 |
 |
Client
: |
Oil and
Natural Gas Corporation Ltd. Mehsana |
 |
 |
Main
Contractor : |
Engineering Projects
India Ltd. |
| |
 |
Back
to back Contractor : |
Newton Engineering
& Chemicals Ltd. |
| |
 |
Consultant
: |
Triune Projects Pvt.
Ltd. |
| |
 |
Project
: |
Modification/Upgradation
of Group gathering station at Santhal, Mehsana, Gujarat
on a Lumpsum Turnkey basis. |
| |
 |
The
Project Consists of : |
Residual
Engineering, Procurement, Supply, Fabrication, Construction,
Erection, Installation, Testing & Commissioning. |
| |
|
|
|
| |
|
Systems
Involved |
| |
Piping Manifolds
|
| Separators |
| Heater Treaters
|
| Fuel Gas Scrubbers
|
| Vent Stacks |
| Chemical Dosing
System |
| H2S GAS monitoring
and detection system |
| Fire Fighting &
Fire Alarm System |
| Electrical WORK |
| Instrumentation
WORK |
| Civil / Structural
Work
|
|
| |
|
|
|
| |
|
Major
Equipments |
| |
Separators |
6
Nos. |
| Heater Treaters |
4 Nos. |
| Fuel Gas Scrubbers
|
2 Nos. |
| Fuel Gas KO Drum
|
2 Nos. |
Vent Stack |
2 Nos. |
|
| |
|
|
|
| |
|
Electrical |
| |
11 kv
HT Switch Gear Panel |
2
Nos. |
| 11 Kv / 433v 1250
KVA Transformer |
2 Nos. |
| PMCC ( MV SWITCH
GEAR ) |
2 Nos |
| 415/240 v Lighting
Transformer |
2 Nos. |
| Pumps & Motors |
36 Nos. |
| Electrical Cables
( Mining Cables) |
40 Km |
| Battery , Battery
Charger Cum DCCB |
2 Nos. |
| UPS / 2 x 8
& 2 x 9 KVA |
2 Nos. |
|
| |
|
|
|
| |
|
Instrumentation
Work |
| |
Mass Flow Meter
|
| BS & W Analysers |
| Control Valves (
36 NOS.) |
| Shutdown Valves
( 30”, 26”, 24” SIZE) |
| Pressure Safety
Valves |
| Pressure , Flow
Transmitters |
| Pressure, Temp,
Level Gauges |
| Pressure, Level,
Temp Switches |
| Breather Valves |
| IP Converter |
| Recorders |
| Indicators |
| Pressure, Level,
Temperature Indicating Controllers |
| Totalizers |
| Orifice Assemblies
( Up TO 30” SIZE) |
|
| |
|
|
|
| |
|
Piping |
| |
1/2 “ to 30
“ Piping ( NACE ) of 1,00,000 Inch Mtr |
| |
Valves 1/2 “
to 30 “ 150 Class 1000 Nos. |
|
| |
|
|
|
|
Pictorial
View of Unit Piping
Mitsubishi Heavy Industries Ltd. P.T.A Plant - Haldia |
|
| |
|
Project
Description : (1) Residual Engineering
(2) Procurement (3) Installation
(4) Commissioning (Civil, Electrical, Mechanical, Instrumentation,
Insulation, Painting) |
|
|
|
|
Systems
Involved : (1) Piping Manifolds
(2) Seperators
(3) Heater Treaters (4) Fuelgas Scrubbers (5) Ventstacks
(6) Chemical Dosing System (7) H2S Gas Monitering and
Detection System (8) Fire Fighting & Fire Alarm System
(9) Electrical Work
(10) Instrumentation Work (11) Civil/Structural Work |
|
| |
 |
| |
|
|